other important projects

Expansion of the Arroyo Miel WWTP

Benalmádena - Spain


Design and construction of Wastewater Treatment Plant for 275,000 inhabitants with a capacity of 40,000 m3/ day. The wastewater treatment plant is located inside a major and sensitive seaside tourist location. This required the selection of a biological process that minimizes space requirements and allows for the system to be located inside the structure. A complex and state-of-the-art deodorizing system was installed to alleviate potential odor related issues in the area.

Facts of the project
40,000 m3/ day
275,000 inhabitants
Located in a seaside tourist and urban location
Structured submerged biofilter
Sludge treatment with anaerobic digestion
Powerful deodorization system