other important projects

S8 Highway

Łodz, Poland


The works carried out in the Syców - Kępno - Sieradz - A1, include the construction of three segments in the vicinity of the city of  Łodz that adds up to a total 59 Km highway with two lanes in each direction and 100 km/h design speed. The segments are the following:

  • Segment 3: Wieruszow – Walichnowy
  • Segment 5: Sieradz Poludnie - Lask
  • Segment 6 y 7: Lask - Roza y Dobron - Roza

The project includes the construction of interchanges, service areas, a great number of structures including wildlife overpasses and large viaducts, as the ones constructed over Warta River, of 950 m long and  Grabia River of 840 m long.

Facts of the project
Segment 6 y 7: 9.2 y 3.3 km, 2 interchanges, 1 viaduct Grabia River, 320 m long, 4 underpasses, and 6 overpasses
Segment 3: 13 km highway with 2 lanes in each direction, 12 m central reserve, 2 service areas, 7 overpasses, 1 underpass, 2 wildlife overpasses, y 30 service paths.
Segment 5: 33,7 km highway with 2 lanes in each direction. 3 interchanges, 2 service areas and 1 maintenance point. 3 viaducts (Warta River, 950 m long; Grabia River, 840 m long; Konska River, 225 m long).
Segment 5: 15 underpasses, 10 overpasses, 1 pass over the channel and 2 walkways