June 2013

 

The I-595 Project hits another milestone opening to the drivers the permanent eastbound lanes from Nob Hill Road to Davie Road.

 

January 2013

Construction is maintained at all times, the number of lanes and posted speed (65 mph in the mainline) is 170,000 vehicles/day on I-595 Corridor and 52,000 vehicles/day on SR-84

March 2013
  • Bertha departed from the factory in February by boat in 40 pieces with over 900 tn of weigh. This technical of transportation is a state-of-art and with a great economic advantage. The pieces have arrived to Seattle in March

December 2012

East Side Access is one of the largest public work projects ever undertaken by the MTA. It is also the recipient of one of the largest federal full funding grants to date.

 

The SR 99 Seattle Bored Tunnel has constructed the biggest EPB TBM machine ever built named "Bertha".

January 2012
  • More than 800 workers have been working in the Portuguese Dam during RCC placement with nonstop working schedules (24/7)

March 2012
  • I-595 completes one of the project's greatest milestones with one year remaining

August 2011

Bechara Industrial Area Channel Construction – San Juan, Puerto Rico

Agency: U.S. Army Corps of Engineers (USACE)
January 2011
  • SR99 - Seattle Tunnel Partners.

    Agency:Washington State Department of Transportation (WSDOT)
April 2011
  • Dragados USA was awarded the Calaveras Dam contract

    Agency: San Francisco Public Utilities Commission (SFPUC)
June 2010
  • Dragados USA was awarded the Rio Puerto Nuevo Flood Control Project, PR contract.

    Agency: U.S. Army Corps of Engineers (USACE)
April 2010

Dragados Group of Companies in the United Sates had over 1,345 employees

Dragados Canada was awarded the South Fraser Perimeter Road Project – Vancouver, British Columbia, Canada contract:

Agency:FTG Fraser Transportation Group